CF1288A.Deadline

传统题 时间 2000 ms 内存 256 MiB 5 尝试 1 已通过 1 标签

Deadline

Adilbek was assigned to a special project. For Adilbek it means that he has nn days to run a special program and provide its results. But there is a problem: the program needs to run for dd days to calculate the results.

Fortunately, Adilbek can optimize the program. If he spends xx (xx is a non-negative integer) days optimizing the program, he will make the program run in dx+1\left\lceil \frac{d}{x + 1} \right\rceil days (a\left\lceil a \right\rceil is the ceiling function: 2.4=3\left\lceil 2.4 \right\rceil = 3, 2=2\left\lceil 2 \right\rceil = 2). The program cannot be run and optimized simultaneously, so the total number of days he will spend is equal to x+dx+1x + \left\lceil \frac{d}{x + 1} \right\rceil.

Will Adilbek be able to provide the generated results in no more than nn days?

Input

The first line contains a single integer TT (1T501 \le T \le 50) — the number of test cases.

The next TT lines contain test cases – one per line. Each line contains two integers nn and dd (1n1091 \le n \le 10^9, 1d1091 \le d \le 10^9) — the number of days before the deadline and the number of days the program runs.

Output

Print TT answers — one per test case. For each test case print YES (case insensitive) if Adilbek can fit in nn days or NO (case insensitive) otherwise.

Note

In the first test case, Adilbek decides not to optimize the program at all, since dnd \le n.

In the second test case, Adilbek can spend 11 day optimizing the program and it will run 52=3\left\lceil \frac{5}{2} \right\rceil = 3 days. In total, he will spend 44 days and will fit in the limit.

In the third test case, it's impossible to fit in the limit. For example, if Adilbek will optimize the program 22 days, it'll still work 112+1=4\left\lceil \frac{11}{2+1} \right\rceil = 4 days.

Samples

3
1 1
4 5
5 11
YES
YES
NO

在线编程 IDE

建议全屏模式获得最佳体验